The 1970s WRSU Memories
Rutgers Radio - 630 AM/680 AM/88.7 FM www.wrsu.org
WRSU : Since 1948
1|625
Something from the Memory Book - Who remembers bowling in the basement of the Student Center?
2|625
1970 - The long process to go FM
3|625

Your Browser does not support PDF. Link to the PDF!

1970 - The Scully - Great workhorse of a Tape Machine.
4|625
1970
5|625
1970
6|625

Your Browser does not support PDF. Link to the PDF!

1970 - Paper work for one of the LPB AM transmitters.
7|625
1970
8|625
1970
9|625

Your Browser does not support PDF. Link to the PDF!

1970 - Inventory of Station equipment.
10|625
1970 - Cranky Students - Bomb Scares or Being on the AIR - Priorities ?
11|625
1970 - Scarlet Letter
12|625
1970 - Scarlet Letter
13|625
AM Master Control - Later Production - See Announce Booth 1 in the Back ground.
14|625
1970 - Scarlet Letter
15|625
1970 - Scarlet Letter
16|625
1970 - Scarlet Letter
17|625
1970 Work Sheet for the New Schedule
18|625
19|625
The LAST AM Limiter
The M-6543 ended its life as a limiter on the Marti Radio
20|625
RCA 77DX - WRSU owned several. They used to be Studio A, sometimes hanging from a boom, or sitting the table.
There were 2, until one was stolen, the last was secured in Tech.
21|625
RCA 77DX - WRSU owned several. A workhorse in radio and TV
22|625
RCA 77DX
23|625
1971 - The Blue Prints for the Transmitter Building.
24|625
1971 - Always working on keeping the AM on the Air
25|625
1971 - Ever Closer to FM
26|625
1971 - WRSU FM gets approval
27|625
1971 Scarlet Letter
28|625
1971 Scarlet Letter
29|625
1971 Scarlet Letter
30|625
1971 AM Master Control - Later Production.
31|625
1971 AM Master Control - Later Production.
32|625
1971 Scarlet Letter
33|625
1971 Scarlet Letter
34|625
1971 Hard at Work in the News Room - News Production door on the right.
35|625
1971
36|625
37|625
More Instructions on how to do things.
38|625
The Phones - for years, WRSU had 'free' phones. So our staff, and others came up and made long distance calls. And Ran up the bill. Logs and locks were only a partial solution. Seems antiquated today when most (all?) have a phone in their pocket. This was a big drain on WRSU budget.
39|625
1972 - WRSU PO - But the business staff was often slow paying the bills....
40|625
1972
41|625
1972
42|625
1972
43|625
1972 Paper work continues...
44|625
1972 Dance Marathon
45|625
1972 Dance Marathon - WRSU was there
46|625
1972 - War Protests - the Berkley of the East
47|625
1972
48|625
1972 - The Slow Push for FM - Interference was an early problem which took a long time to go away.
49|625
1972 - WRSU was never #1
50|625
1972 - More Survey Results
51|625
1972 - Studio Center Layout
52|625
1972 - Final Clearance Comes - Now the next step begins
53|625
1972
54|625
1972 - Scarlet Letter Year Book 1 Cover
55|625
1972
56|625
1972
57|625
1972
58|625

Your Browser does not support PDF. Link to the PDF!

1972 - Scarlet Letter Year Book 2 Cover
59|625
60|625
61|625
62|625
63|625
64|625
65|625
66|625
67|625
68|625
69|625
70|625
71|625
72|625
73|625

Your Browser does not support PDF. Link to the PDF!

74|625
1973 - Hand out for the Cosmic DJ - it was the 70s
75|625
1973 - Always covering Rutgers Sports
76|625

Your Browser does not support PDF. Link to the PDF!

1973 - How to Do radio - 1970s Style
77|625
1973 - Shipping Label - Notice No FM yet.
78|625
1973 - January 24 1974
79|625
1973 - February - WRSU and Easter Seals campaign.
80|625
1973 - Voice of Greece - Donated by Louis Economopoulos
81|625
1973 - Radio Line Documentation
82|625
1973 - Official Announcements for the Engineering Department
83|625
1973 - WRSU keeps working on FM
84|625
1973 - FM is coming along - Rutgers Football Magazine
85|625
1973 - Rutgers Football Magazine
86|625
1973 - One of the many stories getting FM running - Interference was a major problem back then
87|625
88|625
1973 Record Hop policy. More rules and regulations which makes things work.
89|625

Your Browser does not support PDF. Link to the PDF!

1973 A long List of things to do for the Construction of FM.
90|625
1973
91|625
1973 The Mugrat
92|625

Your Browser does not support PDF. Link to the PDF!

1973 How to Book from AM Master Control
93|625

Your Browser does not support PDF. Link to the PDF!

1973 - Ordering Radio Line for various broadcasts. AM or FM, Radio Lines were the only way to do remotes until the 1990s.
94|625

Your Browser does not support PDF. Link to the PDF!

1973 Random Radio Line Order for Colgate at 8 pm
95|625
1973 Scarlet Letter Cover
96|625
WRSU-AM 680 - Before FM in 1973
97|625
Mark Greenberg in the Record Library. Notice how empty the room is.
98|625
Editing a Show on the Scully 280 in Production. Notice the Empty Future FM Control in the next room. The Far room is AM Master Control.
99|625
1973 - Scarlet Letter
100|625
New Brunswick High School Program - Broadcast by WRSU-FM - May 11 1974
This is not last very long....Audio Available Under Sounds
101|625
New Brunswick High School Program - Broadcast by WRSU-FM - May 25 1974
Front
102|625
New Brunswick High School Program - Broadcast by WRSU-FM - May 25 1974
Back
103|625
New Brunswick High School Program - Broadcast by WRSU-FM - June 1 1974
Front - Audio Available Under Sounds 1973
104|625
New Brunswick High School Program - Broadcast by WRSU-FM - June 1 1974
Back - Audio Available Under Sounds 1973
105|625
New Brunswick High School Program - Broadcast by WRSU-FM - June 15 1974
106|625
1973 - Testing FM Control so it would be already for the big Day.
107|625
NJ Assembly
108|625
1973- Progress Check - It was Long Haul done by many different students to get the FM Licence
109|625
1973 - On the AM air from AM Master Control - Later Production
110|625
111|625
First FM Football Broadcast - September 21, 1974
112|625

Your Browser does not support PDF. Link to the PDF!

1974 WRSU's First FM Transmitter
113|625
1974 WRSU's First FCC License
114|625
1974 Production - May not be from 1974
115|625
1974 WRSU-AM was still trying to get some commercials....
116|625
1974 Scarlet Letter - WRSU is listed...
117|625
1974 - Live from the State Theather
118|625
1974 - What to take on a remote
119|625
1974
Donated by Michael Blishak 78
120|625
1974
Donated by Michael Blishak 78
121|625
Donated by Michael Blishak 78
122|625
Donated by Michael Blishak 78
123|625
Donated by Michael Blishak 78
124|625
1974 Letter Head - Back in the olden days, the only place you ever saw the WRSU Logo was the Targum.
125|625
Info Packet given out the the prospective New staff.
Donated by Michael Blishak 78
126|625
WRSU was very serious about Payola and FM rules. This comes from all the hoops that were jumped to set the FM License. - Donated by Michael Blishak 78
127|625
Clipping concerning Cheryl Washington
128|625
1974
129|625
The Original FM Sign Off text. This edit was used for years. Notice the change from Metric to English measurements.
130|625
Targum's Coverage of the FM Sign on.
131|625
1974
132|625
1974
133|625
1974
134|625
1974 - Stock Report - From Russ Lacondro of E F Hutton New Brunswick Office
135|625
1974 - WRSU FM receives praise
136|625
1974
137|625
1974 - Continuing the WRSU tradition of Following Rutgers Sports
138|625
1974 - The 2nd Set of FM Managers take office
139|625
1974 - Radio Lines - Still needed to run the AM System
140|625
1974 - More Radio Lines....
141|625
1974 - Fall 74 - Football Schedule and the covering staff
142|625
1974 - Rutgers Football Results
143|625
1974 - WRSU Radio Lines Budget
Radio Lines used a large portion of WRSUs Budget - As compare to today it is free via the internet
144|625
1974 - More Production Rules - There was tremendous demand for Production - It was almost never empty
145|625
1974 - Look at the Names. Which ones stuck around?
146|625

Your Browser does not support PDF. Link to the PDF!

1974 - Election Night Schedule
WRSU had a huge news department - News at Noon, 5 pm and a full half hour at 10:30 pm
147|625
1974 - Alan and Lewis - Rutgers Outlook Magazine
148|625
1974-75 Basketball Schedule and the covering staff.
149|625
1974-75 Rutgers Basketball Final Scores
150|625
1974 Scarlet Letter
151|625
WRSUs Past is Part of Rutgers Past.
152|625
12 College Avenue - WRSU first Home.
153|625
1974 - Our first listing as WRSU-FM
154|625
1974 - Scarlet Letter
155|625
1974 - Scarlet Letter
156|625
1974 - Scarlet Letter
157|625
1974 - Scarlet Letter
158|625
1974 - Scarlet Letter Mark Greenberg in the NEW FM control Room using the Gates Executive Console
159|625
1974 - Scarlet Letter
160|625
1974 - Scarlet Letter Richard Lee Harvey - First FM Chief Engineer
161|625
1974 - Scarlet Letter
162|625
1974 - Scarlet Letter Our First FM Logo and Banner
163|625
1974 - Scarlet Letter
164|625
1974 The University Staff - All were great help the fledgling FM Station.
165|625
166|625
167|625
168|625

Your Browser does not support PDF. Link to the PDF!

169|625

Your Browser does not support PDF. Link to the PDF!

170|625

Your Browser does not support PDF. Link to the PDF!

171|625
172|625
173|625

Your Browser does not support PDF. Link to the PDF!

174|625
Richard Lee Harvey 74 - First FM Chief Engineer
175|625
This photo was published in the 1974 year book. This was an old photo in 1974. Notice the Student Center is not yet built.
176|625
From the Welcome Rutgers Engineering Book. Yes tuition was $585. A very good deal in 1974
177|625
The list of required curricula for the College of Engineering Page 1
178|625
The list of required curricula for the College of Engineering Page 2
179|625

Your Browser does not support PDF. Link to the PDF!

Voice of Greece Script - Donated by Louis Economopoulos
180|625
1974 Voice of Greece - Donated by Louis Economopoulos
181|625
1974 Voice of Greece - Donated by Louis Economopoulos
182|625
1974 Voice of Greece - Donated by Louis Economopoulos
183|625
1974 Voice of Greece - Donated by Louis Economopoulos
184|625
1974 Voice of Greece - Donated by Louis Economopoulos
185|625
1974 Voice of Greece - Donated by Louis Economopoulos
186|625
187|625
Election Night 1975 - Art Weissman
188|625
Election Night 1975 - Art Weissman, Unknown, Mike Blishak, Stuart Naar
189|625
In Studio A - Unknown Staffer
190|625
Eric Strassler on the FM Board
191|625
Election Night 75 Staff
192|625
Bob Kaplow and "Shoes" :
193|625
Mike Blishak and John O'Donnel in the Outer Office
194|625
Paul Maranaccio in the News Room
195|625
FM control looking into Studio A 1975
196|625
Anchors Art Weissman, Stuart Naar
197|625
Dave Yuckman - Studio A checking the results
198|625
From Studio A into FM Unknown, Eric Strassler, Mike Blishak, Linda Gold
199|625
The Election night photos were taken by Mitch Hymowitz - GM 75-76
200|625
The News Room with our 1970s logo.
201|625
Dr. Ross Baker offers insight to the election.
202|625
Dave Yuckman in the back of the News Room.
203|625
1975 A View from Production - Producing a show for future broadcast
204|625
1975 Whats RU Doing? Always Serving the Big RU
205|625
Dave Yuckman and Mike Blishak - Image supplied by Mike Blishak
206|625
Mike Blishak in Studio A - Image supplied by Mike Blishak
207|625
Last Minutes Notes on the Orientation meetings. Some things do not change.
208|625

Your Browser does not support PDF. Link to the PDF!

1975 Program Guide. Not that much real information on what was on, but was something to give out.
209|625
210|625
Steve Goffreda - GM - revised the Record Hop Policy Again.
211|625
212|625
Michael Blishak checking the UPI wire
213|625
Michael Blishak in News Production - Notice the AG 500 Monophonic tape machine.
214|625
FM Control 1975 - before the Scully Tape machines were replaced. And Only two Cart Machines.
215|625
Michael Blishak painting the News Room
216|625
Painting the News Room - Bob Frish and Barbara Learner
217|625
Painting the News Room - Bob Frish and Barbara Learner
218|625

Your Browser does not support PDF. Link to the PDF!

Script for an Anniversary Show - Saved by Michael Blishak
219|625
1975 Alan And Lewis - This Program Started on th AM amd moved to FM
220|625
1975 Alan and Lewis
221|625
1975 WRSU was part of a state wide network to raise money for Easter Seals
222|625

Your Browser does not support PDF. Link to the PDF!

1975 WRSU was part of a state wide network to raise money for Easter Seals
223|625
1975
224|625
1975 Official Notice - WRSU-AM to Close
225|625
1975 A map of the WRSU-AM coverage at Douglass College
226|625
1975 Another List of Radio Lines from the AM system - Then kept for remotes.
227|625
1975 More Radio lines - Very useful in a time a long time ago
228|625

Your Browser does not support PDF. Link to the PDF!

1975 Program guide - Note the front page was drawn by Jack Wrightson -
229|625
1975 - Record Hop rules written by Eric Strassler - Eric Ran a tight ship. Eric was alway on top of things that needed to be done.
230|625
231|625
232|625
233|625
234|625
235|625
236|625
237|625
238|625
239|625
240|625
241|625
242|625
243|625
244|625
245|625
246|625
247|625
248|625
249|625
250|625
1975 WRSU participated in the Cancer Marathon and Covered live for all three days
251|625
1975 - New Managers as posted in the Targum
252|625
1975 Official press release for the New Managers.
253|625
1975 Saturday Special Hosted by Mike Blishak - A real fun show to produce!
254|625
Micheal Blishak and Mayor George Tompkins
supplied by Mike Blishak
255|625
Live From Seaside Heights 1975
supplied by Mike Blishak
256|625
Live From Seaside Heights 1975
supplied by Mike Blishak
257|625
Live From Seaside Heights 1975
supplied by Mike Blishak
258|625
Live From Seaside Heights 1975
supplied by Mike Blishak
259|625
Live From Seaside Heights 1975
supplied by Mike Blishak
260|625
Live From Seaside Heights 1975
supplied by Mike Blishak
261|625
Micheal Blishak and Mayor George Tompkins
supplied by Mike Blishak
262|625
Live From Seaside Heights 1975
supplied by Mike Blishak
263|625
Live From Seaside Heights 1975
supplied by Mike Blishak
264|625
Live From Seaside Heights 1975
supplied by Mike Blishak
265|625
Live From Seaside Heights 1975
supplied by Mike Blishak
266|625
Live From Seaside Heights 1975 - Mark Harris, Bob Elhert, Bob Frish
267|625
Live From Seaside Heights 1975
supplied by Mike Blishak
268|625

Your Browser does not support PDF. Link to the PDF!

Targum - Live From Seaside Heights 1975
supplied by Mike Blishak
269|625
Targum story about the Seaside broadcasts - supplied by Mike Blishak
270|625
Live From Seaside Heights 1975
supplied by Mike Blishak
271|625
Live From Seaside Heights 1975
supplied by Mike Blishak
272|625
Live From Seaside Heights 1975
supplied by Mike Blishak
273|625
1975 The official announcement for the RAC - supplied by Mike Blishak
274|625
1975 The official announcement for the RAC - supplied by Mike Blishak
275|625
Tech sign Up to Cover the Board for the 75-76 Basketball Season - It was fun to Engineerer from FM control. You had to pay attention, and be ready.
276|625
1975 WRSU spent too much money and often forgot to pay the bills - College students and paper work...
277|625
1975 Scarlet Letter
278|625
1975 Billy Joel at Rutgers....
279|625
1975 Eric Strassler and Mitch Hymowitz also worked for the station. We had constant problems with the Morse code leaking into our system.
280|625
1975 Scarlet Letter - The election night crew
281|625
1975 Scarlet Letter - Art Weisman and Stu Naar
282|625
WRSU Management 1975
283|625
1975 - Eric Strassler
284|625
1975 - Scarlet Letter
285|625
1975
286|625
1975 - Voice of Greece Saved and supplied by
Louis T. Economopoulos
287|625
Saved and supplied by
Louis T. Economopoulos
288|625
1976 Bumper Sticker
289|625
1976 - Radiothon for Cripple Kids
290|625
1976 In the Early Days of FM, Interference reports were common. This is one of many. WRSU 88.7 Mhz is very close to Channel 6 Philadelphia.
291|625

Your Browser does not support PDF. Link to the PDF!

1976 WRSU Phones bills were out of this world. They were 'free' phones, in a age when calls were expensive. WRSU tried to keep the bills down. Phone Logs really did not work.
292|625
Mark Harris 76 In Production - FM on the Right. Studio A in Center
WRSU @nd FM Chief Engineer.
293|625

Your Browser does not support PDF. Link to the PDF!

1976 News Department Update from Mike Blishak
294|625

Your Browser does not support PDF. Link to the PDF!

1976 The NEW News Schedule.
295|625
1976 Run Records Run - Order form
296|625
1976 WRSU schedule. Things did get done when there was only paper.
297|625

Your Browser does not support PDF. Link to the PDF!

1976 The News Schedule and general View of the Music/Specials
298|625
1976 Record Hop Rates.
299|625
1976
300|625
1976 WRSU closes the AM band after 28 years - 1948 to 1976
301|625
1976 News Department Update - Page 1
302|625
1976 News Department Update - Page 2
303|625
1976 - 10 Big news Casts as week. 10:30 was 30 minutes long.
304|625

Your Browser does not support PDF. Link to the PDF!

1976 Radio Council Business - The News Department
305|625
A Note from University President Dr. Bloustein - Dr. Bloustein was a regular visitor to WRSU to due the periodic View from the Presidents Office
306|625
1976 - Congratulations from the Office of Public Information and Dave Levine
307|625
1976 From Mike Blishak to the Staff - for the Trenton Rally
308|625
1976 Big Year for the Basketball Team
309|625
1976
310|625
1976 Mike Blishak goodbye to the News Staff.
311|625
1976 News Release for Run Rutgers Run
312|625
1976 Order Form for Run Rutgers Run
313|625
1976 Radio Line Order for the Middlesex County Fair. WRSU was there over the entire session. A lot of work.
314|625
1976 - Cost to be live at the Middlesex County Fair
315|625
1976 Live From Seaside Heights - A lot of work. A lot of Fun.
316|625
1976 - the contract for the Seaside Heights broadcast
317|625
1976 - The Freedom Train - Bob Lazarczyk and Jay Duhl
318|625
319|625
Selection 76 Assignments
320|625
Selection 76
321|625
Selection 76
322|625
1976 Dave Yuckman and Dan Schleck in Production
323|625
1976 - The News Room - Steve Murphy and Arnie Kaplan
324|625
1976 - Helena Tennebaum, Marc Walker, Arnie Kaplan in the Record Library
325|625
1976 - Steve Murphy in Announce Booth 1
326|625
1976 A Christmas Carol on WRSU
327|625
1976 - WRSU participated in a Christmas Toy Drive.
328|625
1976 The Half Hour version of A Christmas Carol by WRSU Staff
329|625
Lori Starr - DJ WRSU DJ in FM Control - Supplied by Lori Starr
330|625

Your Browser does not support PDF. Link to the PDF!

1976 Another instruction book on how to use Production by Linda Gold Broido.
331|625
1976 - Flyer on WRSU - Note the Manager Names
332|625
1976 - Ceramic Tile from College of Engineering Open House - Saved by Mike Blishak
333|625
1976 - How to do a remote
334|625
1976 - Scarlet Letter
335|625
1976 Landing Lane Bridge - It was alway fun to drive across.
336|625
1976
337|625
1976
338|625
1976
339|625
Mark Harris with the Presidential Console, in tech. After this was taken out, it was in storage in the hallway for over Twenty Five years.
340|625
1976 - Scarlet Letter
341|625
1976
342|625
1976 Mark Harris - 2nd Chief Engineer.
343|625
1976
344|625
1976 Mike Blishak - News Director
345|625
1976 Eric Strassler - Operations Director and President of Radio Council.
346|625
1976 Mitch Hymowitz - Station Manager
347|625
1976 Scarlet Letter
348|625
1976 Scarlet Letter
349|625
1976 Scarlet Letter
350|625
1976 Scarlet Letter
351|625
Mark Harris - 2nd FM Chief Engineer
352|625
353|625
354|625
355|625
356|625
357|625
358|625
359|625
360|625
361|625
FCC License - Blue
362|625
FCC License - Orange
363|625
Duke Markos in FM
364|625
Random UPI Printout
365|625
366|625
367|625
368|625
Run Rutgers Run
To Hear Run Rutgers Run, click on 1976 Sounds
369|625
Run Rutgers Run
To Hear Run Rutgers Run, click on 1976 Sounds
370|625
Tim Korzun
371|625
372|625
1976 - Voice of Greece - Donated by Louis Economopoulos
373|625
1976 - Voice of Greece - Logo - Donated by Louis Economopoulos
374|625
1976 - Voice of Greece - Donated by Louis Economopoulos
375|625
1976 - Voice of Greece - Donated by Louis Economopoulos
376|625
1976 - Voice of Greece - Donated by Louis Economopoulos
377|625
1976 - Voice of Greece - Donated by Louis Economopoulos
378|625
Who remembers the clanking AP machine in the Closet in the News Room?
379|625
Basketball Schedule... and who covered it.
380|625
Paper work Anyone?
381|625
Remember Ma Bell?
382|625

Your Browser does not support PDF. Link to the PDF!

The Football schdule.... so the news staff could do half time news.
383|625
WRSU-FM business card - Notice the North Jersey Phone number. The staff never did understand it.
384|625
Radio Council has spoken....
385|625
1977 - Always changing... and improving...
386|625
387|625
388|625
389|625
Helena Tennabaum in the News Room - Notice the Calender May 1977
390|625

Your Browser does not support PDF. Link to the PDF!

Summer 1977 Program guide - On all summer
391|625
The contract for the Seaside Heights broadcast. The broadcasts were a lot a work and a lot fun.
392|625
Mike Blishak on the Job
393|625
Mike Blishak on the Job - 1977
394|625
Mike Blishak on the Job - 1977
395|625
FM Studio 1977 - Teacs replaced the Scullys
396|625
Wallet size Cards with the Football Schedule
397|625

Your Browser does not support PDF. Link to the PDF!

The Source Program Guide
398|625
Marc Walker, Ira Kaplan, Mike Blishak
399|625
The Lifer Group - 1977
400|625
Roots - WRSU Sunday Cultural Programs
401|625
Again WRSU partisipates in the Christmas Toy Drive
402|625
1977 - The Basketball Schedule - And the staff that covered the broadcasts
403|625
Football Schedule Give Away - RED
404|625
How to do Knightline in the age of Patch Cords
405|625
406|625
The Scarlet Letter 1977
407|625
WRSU ran Chopin Concert Series Live from Kirkpatrick Chapel. Weekdays. Alway short staffed.
408|625
Bruce At Rutgers...
409|625
WRSU exclusively announced where the tickets were to be sold. It was the College Avenue Gym.
410|625
WRSU Record Hop - 1977
411|625
Greg Tabakin, Steve Goefreda, Linda Gold Broido, Jerry Donnelly, Arnie Kaplan, Marc Walker
412|625
Jerry Donnelly, Arnie Kaplan, Marc Walker
413|625
Greg Tabakin, Steve Goefreda, Linda Gold Broido
414|625
Marc Walker
415|625
Arnie Kaplan
416|625
Jerry Donnelly
417|625
Linda Gold Broido
418|625
Steve Goefreda
419|625
Greg Tabakin
420|625
Scarlet Letter - Greg Tabakin
421|625
Mrs. Cass - Always willing to help the station.
422|625
Targum - April 25 1978
Press Notice: WRSU 30 Year Anniversary - Page 1
Next Image is a close up.
423|625
Targum - April 25 1978
Press Notice: WRSU 30 Year Anniversary - Page 1
424|625
Targum - April 25 1978
Press Notice: WRSU 30 Year Anniversary - Page 7
425|625
Targum - April 25 1978
Press Notice: WRSU 30 Year Anniversary
426|625
Targum - April 25 1978
Notice on Sports Page
427|625
Targum - April 25 1978
Campus Briefs - Look near bottom
428|625
Targum - April 25 1978
WRSU Broadcast Live ! No recording is known to exist.
429|625
Targum - April 25 1978
WRSU Broadcast Live ! No recording is known to exist.
430|625
Targum - April 25 1978
Amateur Radio was around the corner, and several staff worked for both.
Free Messages ! How times and technology has changed.
431|625
432|625
Mugrat - April 26 1978
Same day as WRSU's 30 Anniversary
Coincidentally ??
433|625
Mugrat - April 26 1978
Same day as WRSU's 30 Anniversary
434|625
Mugrat - April 26 1978
Same day as WRSU's 30 Anniversary
Coincidentally ??
435|625
Mugrat - April 26 1978
Same day as WRSU's 30 Anniversary
436|625
Mugrat - April 26 1978
Same day as WRSU's 30 Anniversary
437|625
Mugrat - April 26 1978
Same day as WRSU's 30 Anniversary
438|625
Mugrat - April 26 1978
439|625
Mugrat - April 26 1978
440|625
Mugrat - April 26 1978
441|625
Mugrat - April 26 1978
442|625
Mugrat - April 26 1978
443|625
Mugrat - April 26 1978
444|625
Mugrat - April 26 1978
445|625
Mugrat - April 26 1978
446|625
Mugrat - April 26 1978
447|625
Mugrat - April 26 1978
448|625
Mugrat - April 26 1978 - Always a Rivalry
449|625
Mugrat - April 26 1978 - John Often Visiited the Station - It was only Next Door
450|625
451|625
Stuart Brown In Announce Booth 1
452|625
Live From the College Ave Gym - The Barn
Home Court for the Scarlet Knights
453|625
Dan Schleck fixing something under the Studio B Board
454|625
Stuart Brown in the News Room on Typing on a Type Writer for the next News Cast
Notice the Bi-Cencential Logo on the wall.
455|625
Live from the Barn - Don Parrasi (??) Center
456|625
Jerry Donnelly - GM and WRSUs Future 1st Broadcast Administrator
457|625
Stuart Brown Back in the Booth 1
458|625
Former GM Mitch Hymowitz in FM - Notice the Scully Tape Machine on the left
The small stack of records on the right was the ENTIRE Playlist.
459|625
460|625
Knightline - The History of our Long Running Sports Call In Show
461|625
462|625
463|625
464|625
465|625
466|625
1977
467|625
1977
468|625
1977
469|625
Voice of Greece Manolis Polentas Thucydides Markos Maria Sotirhos Louis Economopoulos 1976
470|625
Voice of Greece - Supplied by Louis Economopoulos
471|625
Voice of Greece - Supplied by Louis Economopoulos
472|625
Voice of Greece - Supplied by Louis Economopoulos
473|625
Voice of Greece - Supplied by Louis Economopoulos
474|625
Jeff Spitz - FM Control in 1978 - The green room with the New
Teac on the left,
and the NEW Cart Deck on the right.
475|625
1978 - Dr Bloustein on the View Presidents Office.
476|625
Car Press Pass - These were hard to get back then.
477|625
Un-used WRSU Press Card - Front
478|625
Un-used WRSU Press Card - Back
479|625
1978 - WRSU was the Source - One of our better attempts on a vocal logo
480|625
Pledge Drive - WRSU was not funded over the summer and this money paided for Summer operations
481|625
Pledge Drive - WRSU was not funded over the summer and this money paided for Summer operations
482|625
Pledge Drive - WRSU was not funded over the summer and this money paided for Summer operations
483|625
Mike Blishak in Studio A - The room was more empty back in 78
484|625
Mike Blishak in Studio A - The room was more empty back in 78
485|625
Steve Boy and Dan Schleck in FM control
486|625
Prisoners Against Crime - Notice in the News Tribune
487|625
1978 - The Radio Line Order for the "Prisoners Against Crime" from Rahway State Prison.
488|625
Notice in the Star Ledger for the State Wide Lifers Group Call in - This pushed WRSU Technical Capabilities to the limit
489|625
Lifers Against Crime - Notice in the News Tribune - Supplied by Mike Blishak
490|625
Lifers Against Crime - Supplied by Mike Blishak
491|625
WRSU actually made the UPI round up.
492|625
Prisoners Against Crime
493|625
Prisoners Against Crime
494|625
Prisoners Against Crime
495|625
Prisoners Against Crime
496|625
Prisoners Against Crime
497|625
Prisoners Against Crime
498|625
Prisoners Against Crime
499|625
Prisoners Against Crime
500|625

Your Browser does not support PDF. Link to the PDF!

Prisoners Against Crime
501|625

Your Browser does not support PDF. Link to the PDF!

Prisoners Against Crime
502|625

Your Browser does not support PDF. Link to the PDF!

Prisoners Against Crime
503|625

Your Browser does not support PDF. Link to the PDF!

Prisoners Against Crime - The News Tribune
504|625
Prisoners Against Crime
505|625
Prisoners Against Crime - Targum Ad
506|625
12 College Avenue in 1978
507|625
12 College Avenue in 1978 - Door Closer
508|625
Display in 3rd Floor Lounge in the Rutgers Student Center for WRSU 30th Anniversary
509|625
Display in 3rd Floor Lounge in the Rutgers Student Center for WRSU 30th Anniversary
510|625
The WRSU Clock - Still existed in 2018 - and the Ressloron Home Brew Mixer from about 1960
511|625
Mike Blishak in Studio A - Possibly this photo was taken during the interview for the 30 Years on the Banks program.
512|625
Mike Blishak in Studio A - Possibly this photo was taken during the interview for the 30 Years on the Banks program.
513|625
Mike Blishak in Studio A - Possibly this photo was taken during the interview for the 30 Years on the Banks program.
514|625
Mike Blishak in Studio A - Possibly this photo was taken during the interview for the 30 Years on the Banks program.
515|625
Targum Notice concerning 30 Years on the Banks Program - Front Page
516|625
Targum Notice concerning 30 Years on the Banks Program - Continued from page 1
517|625
Basketball Fund Raiser May 78-Rahway State Prison - Lew Shaine, Bob Lazarczyk, Steve Greene, Tony Grosewz, Dave Siegleman, Tony Malanga
518|625
Basketball Fund Raiser May 78-Rahway State Prison -Lew Shaine, Tony Malanga, Art Still, Bill Bradley, Bob Lazarczyk, Tony Grosewz, Dave Siegleman, Steve Greene
519|625
May 1978 George St Festival - Bob Caputo, Rick Capriolla, Janet Fabro
520|625
May 1978 George St Festival - Rick Capriolla, Janet Fabro - Live from Inside in the PJ Young Window!
521|625
1978 - The Bill for the 30th Anniversary Banquet at the Rutgers Club on College Avenue. If you have a picture of the Banquet, please pass it along.
522|625
1978 - WRSU founder Charles Brookwell and Station Advisor Nathan Shoehalter
523|625
1978 - 30 Years on the Banks - Anniversary Program - So Far has not be duplicated on documenting WRSU History to that point.
524|625
1978
525|625
1978 - Stu Brown was a WRSU Staffer.
526|625
1978 - A list of Radio Lines - Yes $1.40/Month - That is why we kept them.
527|625
1978 - Football Schedule and who covered them.
528|625
1978 - Fixing the Scully.
529|625
Daniel Schleck - Press Pass - all glued together
530|625
Daniel Schleck - Press Pass - all officially signed...
531|625
Scarlet Letter 1978
532|625
1978 - Live From George Street. Left: Jay Duhl, Dan Schleck on the board, Mike Blishak doing the interview. Our Felt Banner.
533|625
1978 - Jay Duhl and Daniel Schleck
534|625
1978 - Scarlet Letter
535|625
1978 - Scarlet Letter
536|625
1978 - Scarlet Letter
537|625
1978 - Alex Kuleshenko(?)
538|625
Don Parissi
539|625
1978 - Stu Brown
540|625
Dan Schleck on the Board
541|625
Ira Kaplan
542|625
1978 - Jerry Donnelly General Manager (Future Broadcast Administrator)
543|625
Fred Potter Chief Engineer
544|625
1978 - Jay Duhl - Promotions
545|625
1978 - Governor Brendan Thomas Byrne being interviewed for WRSU
546|625
1978 - Governor Brendan Thomas Byrne being interviewed for WRSU
547|625
1978 - L to R: Steve Greene, Sue Nocitra, Mike Blishak at the WRSU Christmas party.
548|625
549|625
1978 30 Years on the Banks Jacket Cover - Printed by ABC Records
550|625
1978 30 Years on the Banks Jacket Cover - Printed by ABC Records
551|625
30 Years on the Banks Jacket Cover - Printed by ABC Records - Test Pressing of the Record
552|625
1978-From Joan Kiessling Erle - WRSU Christmas Party
553|625
1978-From Joan Kiessling Erle - WRSU Christmas Party
554|625
1978-From Joan Kiessling Erle - WRSU Christmas Party
555|625
1978-From Joan Kiessling Erle - WRSU Christmas Party
556|625
1978-From Joan Kiessling Erle - WRSU Christmas Party
557|625
1978-From Joan Kiessling Erle
558|625
1978-From Joan Kiessling Erle
559|625
1978-From Joan Kiessling Erle
560|625
1978-From Joan Kiessling Erle
561|625
1978-From Joan Kiessling Erle
562|625
1978-From Joan Kiessling Erle
563|625
1978-From Joan Kiessling Erle
564|625
1978-From Joan Kiessling Erle - WRSU Softball Game
565|625
1978-From Joan Kiessling Erle - WRSU Softball Game
566|625
1978-From Joan Kiessling Erle - WRSU Softball Game
567|625
1978-From Joan Kiessling Erle - WRSU Softball Game
568|625
1978-From Joan Kiessling Erle
569|625
1978-From Joan Kiessling Erle
570|625
1978-From Joan Kiessling Erle
571|625
1978-From Joan Kiessling Erle
572|625
573|625
Image Supplied by Stuart Brown - 1978
574|625
Image Supplied by Dr. Stu Brown who is still playing music all these years later.
SoundsofBroadway.com
575|625
1978 WRSU Orientation Slide Show
WRSU 1978 FM Control - 4 years after going FM
Bob Nagengast
Slide #2
576|625
1978 WRSU Orientation Slide Show
Maria Dandola in Announce Booth 1
Slide #03
577|625
1978 WRSU Orientation Slide Show
Studio A
Slide #4
578|625
1978 WRSU Orientation Slide Show
Production
Checking out the Scully Tape Machine Tom Chabrack CE
Slide #05
579|625
1978 WRSU Orientation Slide Show
Jeff Broido, Unknown , Linda Gold
Slide #06
580|625
1978 WRSU Orientation Slide Show
FM Control - Gate Executive Console Bob Nagengast
Slide #07
581|625
1978 WRSU Orientation Slide Show
FM Control 1978
Slide #14
582|625
1978 WRSU Orientation Slide Show
Cueing a 45. Take it out of gear....
583|625
1978 WRSU Orientation Slide Show
Take to Take a Reading with clanky original remote control.
584|625
1978 WRSU Orientation Slide Show
Pulling a Cart
Slide #18
585|625
1978 WRSU Orientation Slide Show
Bob Nagengast - What should I play next?
Slide #19
586|625
1978 WRSU Orientation Slide Show
Record Library - The Age of Vinyl
Slide #20
587|625
1978 WRSU Orientation Slide Show
News Room - Typewriters everywhere
Slide #21
588|625
1978 WRSU Orientation Slide Show
Another View of the News room - Maria Dandola
No Computers Back then
Slide #22
589|625
1978 WRSU Orientation Slide Show
The Clanking AP Machine - in the closet with reams of yellow paper
Slide #23
590|625
1978 WRSU Orientation Slide Show
News Pro - The Producer Console with Maria Dandola
Slide #24
591|625
1978 WRSU Orientation Slide Show
Checking the Production Board with Tom Chabrack
Slide #29
592|625
1978 WRSU Orientation Slide Show
FM Rack
Slide #30
593|625
1978 WRSU Orientation Slide Show
Tech Desk with Tom Chabrack
Slide #35
594|625
1978 WRSU Orientation Slide Show
Producing a Show in Production - Linda Gold
Slide #38
595|625
1978 WRSU Orientation Slide Show
Production
Note the typewriter and Bulk Tape Eraser
Slide #40
596|625
1978 WRSU Orientation Slide Show
Studio A from the FM Side
Slide #41
597|625
1978 WRSU Orientation Slide Show
News Room
Slide #44
598|625
1978 WRSU Orientation Slide Show
Studio A with the Hanging RCA 77DX microphones
Slide #45
599|625
1978 WRSU Orientation Slide Show
Sports Desk
Paul Spyahala
Slide #46
600|625
1978 WRSU Orientation Slide Show
FM Control
Slide #47
601|625
1978 WRSU Orientation Slide Show
Production
Unknown, Unknown,Rick Capriola
Slide #49
602|625

Your Browser does not support PDF. Link to the PDF!

1979: Production - Long list of things to do
603|625
1979
604|625
WRSU Budget 1979 - 1
605|625
WRSU Budget 1979 - 2
606|625
1979
607|625
1979:WRSU staff in many different media - Left Top: Steve Greene Right Top: Stu Brown Right Bottom: Rick Capriolo
608|625
1979:WRSU was there every day. Watch Out for the PIE Mafia.
609|625
610|625
611|625
612|625
613|625
614|625
1979 Scarlet Letter
615|625
1979 Scarlet Letter
616|625
1979 Scarlet Letter
617|625
1979 - Lew Shane and Robbie Honig in Studio A doing the News
618|625
1979 - Rick Capriolo and Steve Greene in Studio B
619|625
1979 - Larry Leibowitz covers the cancer marathon for WRSU Listeners.
620|625
1979 - Chief Engineer Tom Chabrak and Assistant General Manager Tony Malanga.
621|625
1979 - DJ Dan Lyons
622|625
1979 - Big Bill Thoene
623|625
1979 - Rutgers Fooiball Results
624|625
1979 - Football Schedule and the covering Staff
625|625
1979 - Press Pass
Previous Next Auto Stop Full Screen Larger Smaller
WRSU Memories
1970s
1940-1949 images
1950-1959 images
1960-1969 images
1970-1979 images
1980-1989 images
1990-1999 images
2000-2009 images
2010-2019 images
Something from the Memory Book - Who remembers bowling in the basement of the Student Center?
Something from the Memory Book - Who r
1970 - The long process to go FM
1970 - The long process to go FM
1970 - The Scully - Great workhorse of a Tape Machine.
1970 - The Scully - Great workhorse of
1970
1970
1970
1970
1970 - Paper work for one of the LPB AM transmitters.
1970 - Paper work for one of the LPB A
1970
1970
1970
1970
1970 - Inventory of Station equipment.
1970 - Inventory of Station equipment.
1970 - Cranky Students - Bomb Scares or Being on the AIR - Priorities ?
1970 - Cranky Students - Bomb Scares o
1970 - Scarlet Letter
1970 - Scarlet Letter
1970 - Scarlet Letter
1970 - Scarlet Letter
AM Master Control - Later Production - See Announce Booth 1 in the Back ground.
AM Master Control - Later Production -
1970 - Scarlet Letter
1970 - Scarlet Letter
1970 - Scarlet Letter
1970 - Scarlet Letter
1970 - Scarlet Letter
1970 - Scarlet Letter
1970 Work Sheet for the New Schedule
1970 Work Sheet for the New Schedule

The LAST AM Limiter<br/>The M-6543 ended its life as a limiter on the Marti Radio
The LAST AM Limiter
The M-6543 end
RCA 77DX - WRSU owned several. They used to be Studio A, sometimes hanging from a boom, or sitting the table.<br/>There were 2, until one was stolen, the last was secured in Tech.
RCA 77DX - WRSU owned several. They us
RCA 77DX - WRSU owned several. A workhorse in radio and TV
RCA 77DX - WRSU owned several. A workh
RCA 77DX
RCA 77DX
1971 - The Blue Prints for the Transmitter Building.
1971 - The Blue Prints for the Transmi
1971 - Always working on keeping the AM on the Air
1971 - Always working on keeping the A
1971 - Ever Closer to FM
1971 - Ever Closer to FM
1971 - WRSU FM gets approval
1971 - WRSU FM gets approval
1971 Scarlet Letter
1971 Scarlet Letter
1971 Scarlet Letter
1971 Scarlet Letter
1971 Scarlet Letter
1971 Scarlet Letter
1971 AM Master Control - Later Production.
1971 AM Master Control - Later Product
1971 AM Master Control - Later Production.
1971 AM Master Control - Later Product
1971 Scarlet Letter
1971 Scarlet Letter
1971 Scarlet Letter
1971 Scarlet Letter
1971 Hard at Work in the News Room  - News Production door on the right.
1971 Hard at Work in the News Room -
1971
1971

More Instructions on how to do things.
More Instructions on how to do things.
The Phones - for years, WRSU had 'free' phones. So our staff, and others came up and made long distance calls. And Ran up the bill. Logs and locks were only a partial solution. Seems antiquated today when most (all?) have a phone in their pocket. This was a big drain on WRSU budget.
The Phones - for years, WRSU had 'free
1972 - WRSU PO - But the business staff was often slow paying the bills....
1972 - WRSU PO - But the business staf
1972
1972
1972
1972
1972
1972
1972 Paper work continues...
1972 Paper work continues...
1972 Dance Marathon
1972 Dance Marathon
1972 Dance Marathon - WRSU was there
1972 Dance Marathon - WRSU was there
1972 - War Protests - the Berkley of the East
1972 - War Protests - the Berkley of t
1972
1972
1972 - The Slow Push for FM - Interference was an early problem which took a long time to go away.
1972 - The Slow Push for FM - Interfer
1972 - WRSU was never #1
1972 - WRSU was never #1
1972 - More Survey Results
1972 - More Survey Results
1972 - Studio Center Layout
1972 - Studio Center Layout
1972 - Final Clearance Comes - Now the next step begins
1972 - Final Clearance Comes - Now the
1972
1972
1972 - Scarlet Letter Year Book 1 Cover
1972 - Scarlet Letter Year Book 1 Cove
1972
1972
1972
1972
1972
1972
1972 - Scarlet Letter Year Book 2 Cover
1972 - Scarlet Letter Year Book 2 Cove















1973 - Hand out for the Cosmic DJ - it was the 70s
1973 - Hand out for the Cosmic DJ - it
1973 - Always covering Rutgers Sports
1973 - Always covering Rutgers Sports
1973 - How to Do radio - 1970s Style
1973 - How to Do radio - 1970s Style
1973 - Shipping Label - Notice No FM yet.
1973 - Shipping Label - Notice No FM y
1973 - January 24 1974
1973 - January 24 1974
1973 - February - WRSU and Easter Seals campaign.
1973 - February - WRSU and Easter Seal
1973 - Voice of Greece - Donated by Louis Economopoulos
1973 - Voice of Greece - Donated by Lo
1973 - Radio Line Documentation
1973 - Radio Line Documentation
1973 - Official Announcements for the Engineering Department
1973 - Official Announcements for the
1973 - WRSU keeps working on FM
1973 - WRSU keeps working on FM
1973 - FM is coming along - Rutgers Football Magazine
1973 - FM is coming along - Rutgers Fo
1973 - Rutgers Football Magazine
1973 - Rutgers Football Magazine
1973 - One of the many stories getting FM running - Interference was a major problem back then
1973 - One of the many stories getting

1973 Record Hop policy. More rules and regulations which makes things work.
1973 Record Hop policy. More rules and
1973 A long List of things to do for the Construction of FM.
1973 A long List of things to do for t
1973
1973
1973 The Mugrat
1973 The Mugrat
1973 How to Book from AM Master Control
1973 How to Book from AM Master Contro
1973 - Ordering Radio Line for various broadcasts. AM or FM, Radio Lines were the only way to do remotes until the 1990s.
1973 - Ordering Radio Line for various
1973 Random Radio Line Order for Colgate at 8 pm
1973 Random Radio Line Order for Colga
1973 Scarlet Letter Cover
1973 Scarlet Letter Cover
WRSU-AM 680 - Before FM in 1973
WRSU-AM 680 - Before FM in 1973
Mark Greenberg in the Record Library. Notice how empty the room is.
Mark Greenberg in the Record Library.
Editing a Show on the Scully 280 in Production. Notice the Empty Future FM Control in the next room. The Far room is AM Master Control.
Editing a Show on the Scully 280 in Pr
1973 - Scarlet Letter
1973 - Scarlet Letter
New Brunswick High School Program - Broadcast by WRSU-FM - May 11 1974<br/>This is not last very long....Audio Available Under Sounds
New Brunswick High School Program - Br
New Brunswick High School Program - Broadcast by WRSU-FM - May 25 1974<br/>Front
New Brunswick High School Program - Br
New Brunswick High School Program - Broadcast by WRSU-FM - May 25 1974<br/>Back
New Brunswick High School Program - Br
New Brunswick High School Program - Broadcast by WRSU-FM - June 1 1974<br/>Front - Audio Available Under Sounds 1973
New Brunswick High School Program - Br
New Brunswick High School Program - Broadcast by WRSU-FM - June 1 1974<br/>Back  - Audio Available Under Sounds 1973
New Brunswick High School Program - Br
New Brunswick High School Program - Broadcast by WRSU-FM - June 15 1974
New Brunswick High School Program - Br
1973 - Testing FM Control so it would be already for the big Day.
1973 - Testing FM Control so it would
NJ Assembly
NJ Assembly
1973- Progress Check - It was Long Haul done by many different students to get the FM Licence
1973- Progress Check - It was Long Hau
1973 - On the AM air from AM Master Control - Later Production
1973 - On the AM air from AM Master Co

First FM Football Broadcast - September 21, 1974
First FM Football Broadcast - Septembe
1974 WRSU's First FM Transmitter
1974 WRSU's First FM Transmitter
1974 WRSU's First FCC License
1974 WRSU's First FCC License
1974 Production - May not be from 1974
1974 Production - May not be from 1974
1974 WRSU-AM was still trying to get some commercials....
1974 WRSU-AM was still trying to get s
1974 Scarlet Letter - WRSU is listed...
1974 Scarlet Letter - WRSU is listed..
1974 - Live from the State Theather
1974 - Live from the State Theather
1974 - What to take on a remote
1974 - What to take on a remote
1974<br>Donated by Michael Blishak 78
1974
Donated by Michael Blishak 78
1974<br>Donated by Michael Blishak 78
1974
Donated by Michael Blishak 78
Donated by Michael Blishak 78
Donated by Michael Blishak 78
Donated by Michael Blishak 78
Donated by Michael Blishak 78
Donated by Michael Blishak 78
Donated by Michael Blishak 78
1974 Letter Head - Back in the olden days, the only place you ever saw the WRSU Logo was the Targum.
1974 Letter Head - Back in the olden d
Info Packet given out the the prospective New staff. <br>Donated by Michael Blishak 78
Info Packet given out the the prospect
WRSU was very serious about Payola and FM rules. This comes from all the hoops that were jumped to set the FM License. - Donated by Michael Blishak 78
WRSU was very serious about Payola and
Clipping concerning Cheryl Washington
Clipping concerning Cheryl Washington
1974
1974
The Original FM Sign Off text. This edit was used for years. Notice the change from Metric to English measurements.
The Original FM Sign Off text. This ed
Targum's Coverage of the FM Sign on.
Targum's Coverage of the FM Sign on.
1974
1974
1974
1974
1974
1974
1974 - Stock Report - From Russ Lacondro of E F Hutton New Brunswick Office
1974 - Stock Report - From Russ Lacond
1974 - WRSU FM receives praise
1974 - WRSU FM receives praise
1974
1974
1974 - Continuing the WRSU tradition of Following Rutgers Sports
1974 - Continuing the WRSU tradition o
1974 - The 2nd Set of FM Managers take office
1974 - The 2nd Set of FM Managers take
1974 - Radio Lines - Still needed to run the AM System
1974 - Radio Lines - Still needed to r
1974 - More Radio Lines....
1974 - More Radio Lines....
1974 - Fall 74 - Football Schedule and the covering staff
1974 - Fall 74 - Football Schedule and
1974 - Rutgers Football Results
1974 - Rutgers Football Results
1974 - WRSU Radio Lines Budget<br/>Radio Lines used a large portion of WRSUs Budget - As compare to today it is free via the internet
1974 - WRSU Radio Lines Budget
Rad
1974 - More Production Rules - There was tremendous demand for Production - It was almost never empty
1974 - More Production Rules - There w
1974 - Look at the Names. Which ones stuck around?
1974 - Look at the Names. Which ones s
1974 - Election Night Schedule<br/>WRSU had a huge news department - News at Noon, 5 pm and a full half hour at 10:30 pm
1974 - Election Night Schedule
WRS
1974 - Alan and Lewis - Rutgers Outlook Magazine
1974 - Alan and Lewis - Rutgers Outloo
1974-75 Basketball Schedule and the covering staff.
1974-75 Basketball Schedule and the co
1974-75 Rutgers Basketball Final Scores
1974-75 Rutgers Basketball Final Score
1974 Scarlet Letter
1974 Scarlet Letter
WRSUs Past is Part of Rutgers Past.
WRSUs Past is Part of Rutgers Past.
12 College Avenue - WRSU first Home.
12 College Avenue - WRSU first Home.
1974 - Our first listing as WRSU-FM
1974 - Our first listing as WRSU-FM
1974 - Scarlet Letter
1974 - Scarlet Letter
1974 - Scarlet Letter
1974 - Scarlet Letter
1974 - Scarlet Letter
1974 - Scarlet Letter
1974 - Scarlet Letter
1974 - Scarlet Letter
1974 - Scarlet Letter Mark Greenberg in the NEW FM control Room using the Gates Executive Console
1974 - Scarlet Letter Mark Greenberg i
1974 - Scarlet Letter
1974 - Scarlet Letter
1974 - Scarlet Letter Richard Lee Harvey - First FM Chief Engineer
1974 - Scarlet Letter Richard Lee Harv
1974 - Scarlet Letter
1974 - Scarlet Letter
1974 - Scarlet Letter Our First FM Logo and Banner
1974 - Scarlet Letter Our First FM Log
1974 - Scarlet Letter
1974 - Scarlet Letter
1974 The University Staff - All were great help the fledgling FM Station.
1974 The University Staff - All were g









Richard Lee Harvey 74 - First FM Chief Engineer
Richard Lee Harvey 74 - First FM Chief
This photo was published in the 1974 year book. This was an old photo in 1974. Notice the Student Center is not yet built.
This photo was published in the 1974 y
From the Welcome Rutgers Engineering Book. Yes tuition was $585. A very good deal in 1974
From the Welcome Rutgers Engineering B
The list of required curricula for the College of Engineering Page 1
The list of required curricula for the
The list of required curricula for the College of Engineering Page 2
The list of required curricula for the
Voice of Greece Script   - Donated by Louis Economopoulos
Voice of Greece Script - Donated by
1974 Voice of Greece  - Donated by Louis Economopoulos
1974 Voice of Greece - Donated by Lou
1974 Voice of Greece  - Donated by Louis Economopoulos
1974 Voice of Greece - Donated by Lou
1974 Voice of Greece  - Donated by Louis Economopoulos
1974 Voice of Greece - Donated by Lou
1974 Voice of Greece  - Donated by Louis Economopoulos
1974 Voice of Greece - Donated by Lou
1974 Voice of Greece  - Donated by Louis Economopoulos
1974 Voice of Greece - Donated by Lou
1974 Voice of Greece  - Donated by Louis Economopoulos
1974 Voice of Greece - Donated by Lou

Election Night 1975 - Art Weissman
Election Night 1975 - Art Weissman
Election Night 1975 - Art Weissman, Unknown, Mike Blishak, Stuart Naar
Election Night 1975 - Art Weissman, Un
In Studio A - Unknown Staffer
In Studio A - Unknown Staffer
Eric Strassler on the FM Board
Eric Strassler on the FM Board
Election Night 75 Staff
Election Night 75 Staff
Bob Kaplow and
Bob Kaplow and "Shoes" :
Mike Blishak and John O'Donnel in the Outer Office
Mike Blishak and John O'Donnel in the
Paul Maranaccio in the News Room
Paul Maranaccio in the News Room
FM control looking into Studio A 1975
FM control looking into Studio A 1975
Anchors Art Weissman, Stuart Naar
Anchors Art Weissman, Stuart Naar
Dave Yuckman - Studio A checking the results
Dave Yuckman - Studio A checking the r
From Studio A into FM Unknown, Eric Strassler, Mike Blishak, Linda Gold
From Studio A into FM Unknown, Eric St
The Election night photos were taken by Mitch Hymowitz - GM 75-76
The Election night photos were taken b
The News Room with our 1970s logo.
The News Room with our 1970s logo.
Dr. Ross Baker offers insight to the election.
Dr. Ross Baker offers insight to the e
Dave Yuckman in the back of the News Room.
Dave Yuckman in the back of the News R
1975 A View from Production - Producing a show for future broadcast
1975 A View from Production - Producin
1975 Whats RU Doing? Always Serving the Big RU
1975 Whats RU Doing? Always Serving th
Dave Yuckman and Mike Blishak - Image supplied by Mike Blishak
Dave Yuckman and Mike Blishak - Image
Mike Blishak in Studio A - Image supplied by Mike Blishak
Mike Blishak in Studio A - Image suppl
Last Minutes Notes on the Orientation meetings. Some things do not change.
Last Minutes Notes on the Orientation
1975 Program Guide. Not that much real information on what was on, but was something to give out.
1975 Program Guide. Not that much real

Steve Goffreda - GM - revised the Record Hop Policy Again.
Steve Goffreda - GM - revised the Reco

Michael Blishak checking the UPI wire
Michael Blishak checking the UPI wire
Michael Blishak in News Production - Notice the AG 500 Monophonic tape machine.
Michael Blishak in News Production - N
FM Control 1975 - before the Scully Tape machines were replaced. And Only two Cart Machines.
FM Control 1975 - before the Scully Ta
Michael Blishak painting the News Room
Michael Blishak painting the News Room
Painting the News Room - Bob Frish and Barbara Learner
Painting the News Room - Bob Frish and
Painting the News Room - Bob Frish and Barbara Learner
Painting the News Room - Bob Frish and
Script for an Anniversary Show - Saved by Michael Blishak
Script for an Anniversary Show - Saved
1975 Alan And Lewis - This Program Started on th AM amd moved to FM
1975 Alan And Lewis - This Program Sta
1975 Alan and Lewis
1975 Alan and Lewis
1975 WRSU was part of a state wide network to raise money for Easter Seals
1975 WRSU was part of a state wide net
1975 WRSU was part of a state wide network to raise money for Easter Seals
1975 WRSU was part of a state wide net
1975
1975
1975 Official Notice - WRSU-AM to Close
1975 Official Notice - WRSU-AM to Clos
1975 A map of the WRSU-AM coverage at Douglass College
1975 A map of the WRSU-AM coverage at
1975 Another List of Radio Lines from the AM system - Then kept for remotes.
1975 Another List of Radio Lines from
1975 More Radio lines - Very useful in a time a long time ago
1975 More Radio lines - Very useful in
1975 Program guide - Note the front page was drawn by Jack Wrightson -
1975 Program guide - Note the front pa
1975 - Record Hop rules written by Eric Strassler - Eric Ran a tight ship. Eric was alway on top of things that needed to be done.
1975 - Record Hop rules written by Eri




















1975 WRSU participated in the Cancer Marathon and Covered live for all three days
1975 WRSU participated in the Cancer M
1975 - New Managers as posted in the Targum
1975 - New Managers as posted in the T
1975 Official press release for the New Managers.
1975 Official press release for the Ne
1975 Saturday Special Hosted by Mike Blishak - A real fun show to produce!
1975 Saturday Special Hosted by Mike B
Micheal Blishak and Mayor George Tompkins<br/>supplied by Mike Blishak
Micheal Blishak and Mayor George Tompk
Live From Seaside Heights 1975<br/>supplied by Mike Blishak
Live From Seaside Heights 1975
sup
Live From Seaside Heights 1975<br/>supplied by Mike Blishak
Live From Seaside Heights 1975
sup
Live From Seaside Heights 1975<br/>supplied by Mike Blishak
Live From Seaside Heights 1975
sup
Live From Seaside Heights 1975<br/>supplied by Mike Blishak
Live From Seaside Heights 1975
sup
Live From Seaside Heights 1975<br/>supplied by Mike Blishak
Live From Seaside Heights 1975
sup
Live From Seaside Heights 1975<br/>supplied by Mike Blishak
Live From Seaside Heights 1975
sup
Micheal Blishak and Mayor George Tompkins<br/>supplied by Mike Blishak
Micheal Blishak and Mayor George Tompk
Live From Seaside Heights 1975<br/>supplied by Mike Blishak
Live From Seaside Heights 1975
sup
Live From Seaside Heights 1975<br/>supplied by Mike Blishak
Live From Seaside Heights 1975
sup
Live From Seaside Heights 1975<br/>supplied by Mike Blishak
Live From Seaside Heights 1975
sup
Live From Seaside Heights 1975<br/>supplied by Mike Blishak
Live From Seaside Heights 1975
sup
Live From Seaside Heights 1975 - Mark Harris, Bob Elhert, Bob Frish
Live From Seaside Heights 1975 - Mark
Live From Seaside Heights 1975<br/>supplied by Mike Blishak
Live From Seaside Heights 1975
sup
Targum - Live From Seaside Heights 1975<br/>supplied by Mike Blishak
Targum - Live From Seaside Heights 197
Targum story about the Seaside broadcasts - supplied by Mike Blishak
Targum story about the Seaside broadca
Live From Seaside Heights 1975<br/>supplied by Mike Blishak
Live From Seaside Heights 1975
sup
Live From Seaside Heights 1975<br/>supplied by Mike Blishak
Live From Seaside Heights 1975
sup
Live From Seaside Heights 1975<br/>supplied by Mike Blishak
Live From Seaside Heights 1975
sup
1975 The official announcement for the RAC - supplied by Mike Blishak
1975 The official announcement for the
1975 The official announcement for the RAC - supplied by Mike Blishak
1975 The official announcement for the
Tech sign Up to Cover the Board for the 75-76 Basketball Season - It was fun to Engineerer from FM control. You had to pay attention, and be ready.
Tech sign Up to Cover the Board for th
1975 WRSU spent too much money and often forgot to pay the bills - College students and paper work...
1975 WRSU spent too much money and oft
1975 Scarlet Letter
1975 Scarlet Letter
1975 Billy Joel at Rutgers....
1975 Billy Joel at Rutgers....
1975 Eric Strassler and Mitch Hymowitz also worked for the station. We had constant problems with the Morse code leaking into our system.
1975 Eric Strassler and Mitch Hymowitz
1975 Scarlet Letter - The election night crew
1975 Scarlet Letter - The election nig
1975 Scarlet Letter - Art Weisman and Stu Naar
1975 Scarlet Letter - Art Weisman and
WRSU Management 1975
WRSU Management 1975
1975 - Eric Strassler
1975 - Eric Strassler
1975 - Scarlet Letter
1975 - Scarlet Letter
1975
1975
1975 - Voice of Greece Saved and supplied by<br/>Louis T. Economopoulos
1975 - Voice of Greece Saved and suppl
Saved and supplied by<br/>Louis T. Economopoulos
Saved and supplied by
Louis T. Eco
1976 Bumper Sticker
1976 Bumper Sticker
1976 - Radiothon for Cripple Kids
1976 - Radiothon for Cripple Kids
1976 In the Early Days of FM, Interference reports were common. This is one of many. WRSU 88.7 Mhz is very close to Channel 6 Philadelphia.
1976 In the Early Days of FM, Interfer
1976 WRSU Phones bills were out of this world. They were 'free' phones, in a age when calls were expensive. WRSU tried to keep the bills down. Phone Logs really did not work.
1976 WRSU Phones bills were out of thi
Mark Harris 76 In Production - FM on the Right. Studio A in Center<br/>WRSU @nd FM Chief Engineer.
Mark Harris 76 In Production - FM on t
1976 News Department Update from Mike Blishak
1976 News Department Update from Mike
1976 The NEW News Schedule.
1976 The NEW News Schedule.
1976 Run Records Run - Order form
1976 Run Records Run - Order form
1976 WRSU schedule. Things did get done when there was only paper.
1976 WRSU schedule. Things did get don
1976 The News Schedule and general View of the Music/Specials
1976 The News Schedule and general Vie
1976 Record Hop Rates.
1976 Record Hop Rates.
1976
1976
1976 WRSU closes the AM band after 28 years - 1948 to 1976
1976 WRSU closes the AM band after 28
1976 News Department Update - Page 1
1976 News Department Update - Page 1
1976 News Department Update - Page 2
1976 News Department Update - Page 2
1976 - 10 Big news Casts as week. 10:30 was 30 minutes long.
1976 - 10 Big news Casts as week. 10:3
1976 Radio Council Business - The News Department
1976 Radio Council Business - The News
A Note from University President Dr. Bloustein - Dr. Bloustein was a regular visitor to WRSU to due the periodic View from the Presidents Office
A Note from University President Dr. B
1976 - Congratulations from the Office of Public Information and Dave Levine
1976 - Congratulations from the Office
1976 From Mike Blishak to the Staff - for the Trenton Rally
1976 From Mike Blishak to the Staff -
1976 Big Year for the Basketball Team
1976 Big Year for the Basketball Team
1976
1976
1976 Mike Blishak goodbye to the News Staff.
1976 Mike Blishak goodbye to the News
1976 News Release for Run Rutgers Run
1976 News Release for Run Rutgers Run
1976 Order Form for Run Rutgers Run
1976 Order Form for Run Rutgers Run
1976 Radio Line Order for the Middlesex County Fair. WRSU was there over the entire session. A lot of work.
1976 Radio Line Order for the Middlese
1976 - Cost to be live at the Middlesex County Fair
1976 - Cost to be live at the Middlese
1976 Live From Seaside Heights - A lot of work. A lot of Fun.
1976 Live From Seaside Heights - A lot
1976 - the contract for the Seaside Heights broadcast
1976 - the contract for the Seaside He
1976 - The Freedom Train - Bob Lazarczyk and Jay Duhl
1976 - The Freedom Train - Bob Lazarcz

Selection 76 Assignments
Selection 76 Assignments
Selection 76
Selection 76
Selection 76
Selection 76
1976 Dave Yuckman and Dan Schleck in Production
1976 Dave Yuckman and Dan Schleck in P
1976 - The News Room - Steve Murphy and Arnie Kaplan
1976 - The News Room - Steve Murphy an
1976 - Helena Tennebaum, Marc Walker, Arnie Kaplan in the Record Library
1976 - Helena Tennebaum, Marc Walker,
1976 - Steve Murphy in Announce Booth 1
1976 - Steve Murphy in Announce Booth
1976 A Christmas Carol on WRSU
1976 A Christmas Carol on WRSU
1976 - WRSU participated in a Christmas Toy Drive.
1976 - WRSU participated in a Christma
1976 The Half Hour version of A Christmas Carol by WRSU Staff
1976 The Half Hour version of A Christ
Lori Starr - DJ WRSU DJ in FM Control - Supplied by Lori Starr
Lori Starr - DJ WRSU DJ in FM Control
1976 Another instruction book on how to use Production by Linda Gold Broido.
1976 Another instruction book on how t
1976 - Flyer on WRSU - Note the Manager Names
1976 - Flyer on WRSU - Note the Manage
1976 - Ceramic Tile from College of Engineering Open House - Saved by Mike Blishak
1976 - Ceramic Tile from College of En
1976 - How to do a remote
1976 - How to do a remote
1976 - Scarlet Letter
1976 - Scarlet Letter
1976 Landing Lane Bridge - It was alway fun to drive across.
1976 Landing Lane Bridge - It was alwa
1976
1976
1976
1976
1976
1976
Mark Harris with the Presidential Console, in tech. After this was taken out, it was in storage in the hallway for over Twenty Five years.
Mark Harris with the Presidential Cons
1976 - Scarlet Letter
1976 - Scarlet Letter
1976
1976
1976 Mark Harris - 2nd Chief Engineer.
1976 Mark Harris - 2nd Chief Engineer.
1976
1976
1976 Mike Blishak - News Director
1976 Mike Blishak - News Director
1976 Eric Strassler - Operations Director and President of Radio Council.
1976 Eric Strassler - Operations Direc
1976 Mitch Hymowitz  - Station Manager
1976 Mitch Hymowitz - Station Manager
1976 Scarlet Letter
1976 Scarlet Letter
1976 Scarlet Letter
1976 Scarlet Letter
1976 Scarlet Letter
1976 Scarlet Letter
1976 Scarlet Letter
1976 Scarlet Letter
Mark Harris - 2nd FM Chief Engineer
Mark Harris - 2nd FM Chief Engineer









FCC License - Blue
FCC License - Blue
FCC License - Orange
FCC License - Orange
Duke Markos in FM
Duke Markos in FM
Random UPI Printout
Random UPI Printout



Run Rutgers Run<br/>To Hear Run Rutgers Run, click on 1976 Sounds
Run Rutgers Run
To Hear Run Rutger
Run Rutgers Run<br/>To Hear Run Rutgers Run, click on 1976 Sounds
Run Rutgers Run
To Hear Run Rutger
Tim Korzun
Tim Korzun

1976 - Voice of Greece  - Donated by Louis Economopoulos
1976 - Voice of Greece - Donated by L
1976 - Voice of Greece - Logo - Donated by Louis Economopoulos
1976 - Voice of Greece - Logo - Donate
1976 - Voice of Greece  - Donated by Louis Economopoulos
1976 - Voice of Greece - Donated by L
1976 - Voice of Greece  - Donated by Louis Economopoulos
1976 - Voice of Greece - Donated by L
1976 - Voice of Greece  - Donated by Louis Economopoulos
1976 - Voice of Greece - Donated by L
1976 - Voice of Greece  - Donated by Louis Economopoulos
1976 - Voice of Greece - Donated by L
Who remembers the clanking AP machine in the Closet in the News Room?
Who remembers the clanking AP machine
Basketball Schedule... and who covered it.
Basketball Schedule... and who covered
Paper work Anyone?
Paper work Anyone?
Remember Ma Bell?
Remember Ma Bell?
The Football schdule.... so the news staff could do half time news.
The Football schdule.... so the news s
WRSU-FM business card - Notice the North Jersey Phone number. The staff never did understand it.
WRSU-FM business card - Notice the Nor
Radio Council has spoken....
Radio Council has spoken....
1977 - Always changing... and improving...
1977 - Always changing... and improvin



Helena Tennabaum in the News Room - Notice the Calender May 1977
Helena Tennabaum in the News Room - No
Summer 1977 Program guide - On all summer
Summer 1977 Program guide - On all sum
The contract for the Seaside Heights broadcast. The broadcasts were a lot a work and a lot fun.
The contract for the Seaside Heights b
Mike Blishak on the Job
Mike Blishak on the Job
Mike Blishak on the Job - 1977
Mike Blishak on the Job - 1977
Mike Blishak on the Job - 1977
Mike Blishak on the Job - 1977
FM Studio 1977 - Teacs replaced the Scullys
FM Studio 1977 - Teacs replaced the Sc
Wallet size Cards with the Football Schedule
Wallet size Cards with the Football Sc
The Source Program Guide
The Source Program Guide
Marc Walker, Ira Kaplan, Mike Blishak
Marc Walker, Ira Kaplan, Mike Blishak
The Lifer Group - 1977
The Lifer Group - 1977
Roots - WRSU Sunday Cultural Programs
Roots - WRSU Sunday Cultural Programs
Again WRSU partisipates in the Christmas Toy Drive
Again WRSU partisipates in the Christm
1977 - The Basketball Schedule - And the staff that covered the broadcasts
1977 - The Basketball Schedule - And t
Football Schedule Give Away - RED
Football Schedule Give Away - RED
How to do Knightline in the age of Patch Cords
How to do Knightline in the age of Pat

The Scarlet Letter 1977
The Scarlet Letter 1977
WRSU ran Chopin Concert Series Live from Kirkpatrick Chapel. Weekdays. Alway short staffed.
WRSU ran Chopin Concert Series Live fr
Bruce At Rutgers...
Bruce At Rutgers...
WRSU exclusively announced where the tickets were to be sold. It was the College Avenue Gym.
WRSU exclusively announced where the t
WRSU Record Hop - 1977
WRSU Record Hop - 1977
Greg Tabakin, Steve Goefreda, Linda Gold Broido, Jerry Donnelly, Arnie Kaplan, Marc Walker
Greg Tabakin, Steve Goefreda, Linda Go
Jerry Donnelly, Arnie Kaplan, Marc Walker
Jerry Donnelly, Arnie Kaplan, Marc Wal
Greg Tabakin, Steve Goefreda, Linda Gold Broido
Greg Tabakin, Steve Goefreda, Linda Go
Marc Walker
Marc Walker
Arnie Kaplan
Arnie Kaplan
Jerry Donnelly
Jerry Donnelly
Linda Gold Broido
Linda Gold Broido
Steve Goefreda
Steve Goefreda
Greg Tabakin
Greg Tabakin
Scarlet Letter - Greg Tabakin
Scarlet Letter - Greg Tabakin
Mrs. Cass - Always willing to help the station.
Mrs. Cass - Always willing to help the
Targum - April 25 1978 <br/>Press Notice: WRSU 30 Year Anniversary - Page 1<br/>Next Image is a close up.
Targum - April 25 1978
Press Noti
Targum - April 25 1978 <br/>Press Notice: WRSU 30 Year Anniversary - Page 1
Targum - April 25 1978
Press Noti
Targum - April 25 1978 <br/>Press Notice: WRSU 30 Year Anniversary - Page 7
Targum - April 25 1978
Press Noti
Targum - April 25 1978 <br/>Press Notice: WRSU 30 Year Anniversary
Targum - April 25 1978
Press Noti
Targum - April 25 1978 <br/>Notice on Sports Page
Targum - April 25 1978
Notice on
Targum - April 25 1978 <br/>Campus Briefs - Look near bottom
Targum - April 25 1978
Campus Bri
Targum - April 25 1978 <br/>WRSU Broadcast Live ! No recording is known to exist.
Targum - April 25 1978
WRSU Broad
Targum - April 25 1978 <br/>WRSU Broadcast Live ! No recording is known to exist.
Targum - April 25 1978
WRSU Broad
Targum - April 25 1978 <br/>Amateur Radio was around the corner, and several staff worked for both.</br>Free Messages ! How times and technology has changed.
Targum - April 25 1978
Amateur Ra

Mugrat - April 26 1978 <br/>Same day as WRSU's 30 Anniversary<br/>Coincidentally ??
Mugrat - April 26 1978
Same day a
Mugrat - April 26 1978 <br/>Same day as WRSU's 30 Anniversary
Mugrat - April 26 1978
Same day a
Mugrat - April 26 1978 <br/>Same day as WRSU's 30 Anniversary<br/>Coincidentally ??
Mugrat - April 26 1978
Same day a
Mugrat - April 26 1978 <br/>Same day as WRSU's 30 Anniversary
Mugrat - April 26 1978
Same day a
Mugrat - April 26 1978 <br/>Same day as WRSU's 30 Anniversary
Mugrat - April 26 1978
Same day a
Mugrat - April 26 1978 <br/>Same day as WRSU's 30 Anniversary
Mugrat - April 26 1978
Same day a
Mugrat - April 26 1978
Mugrat - April 26 1978
Mugrat - April 26 1978
Mugrat - April 26 1978
Mugrat - April 26 1978
Mugrat - April 26 1978
Mugrat - April 26 1978
Mugrat - April 26 1978
Mugrat - April 26 1978
Mugrat - April 26 1978
Mugrat - April 26 1978
Mugrat - April 26 1978
Mugrat - April 26 1978
Mugrat - April 26 1978
Mugrat - April 26 1978
Mugrat - April 26 1978
Mugrat - April 26 1978
Mugrat - April 26 1978
Mugrat - April 26 1978
Mugrat - April 26 1978
Mugrat - April 26 1978 - Always a Rivalry
Mugrat - April 26 1978 - Always a Riva
Mugrat - April 26 1978 - John Often Visiited the Station - It was only Next Door
Mugrat - April 26 1978 - John Often Vi

Stuart Brown In Announce Booth 1
Stuart Brown In Announce Booth 1
Live From the College Ave Gym - The Barn<br/>Home Court for the Scarlet Knights
Live From the College Ave Gym - The Ba
Dan Schleck fixing something under the Studio B Board
Dan Schleck fixing something under the
Stuart Brown in the News Room on Typing on a Type Writer for the next News Cast<br/>Notice the Bi-Cencential Logo on the wall.
Stuart Brown in the News Room on Typin
Live from the Barn - Don Parrasi (??) Center
Live from the Barn - Don Parrasi (??)
Jerry Donnelly - GM and WRSUs Future 1st Broadcast Administrator
Jerry Donnelly - GM and WRSUs Future 1
Stuart Brown Back in the Booth 1
Stuart Brown Back in the Booth 1
Former GM Mitch Hymowitz in FM - Notice the Scully Tape Machine on the left<br/>The small stack of records on the right was the ENTIRE Playlist.
Former GM Mitch Hymowitz in FM - Notic

Knightline - The History of our Long Running Sports Call In Show
Knightline - The History of our Long R





1977
1977
1977
1977
1977
1977
Voice of Greece Manolis Polentas Thucydides Markos Maria Sotirhos Louis Economopoulos 1976
Voice of Greece Manolis Polentas Thucy
Voice of Greece - Supplied by Louis Economopoulos
Voice of Greece - Supplied by Louis Ec
Voice of Greece - Supplied by Louis Economopoulos
Voice of Greece - Supplied by Louis Ec
Voice of Greece - Supplied by Louis Economopoulos
Voice of Greece - Supplied by Louis Ec
Voice of Greece - Supplied by Louis Economopoulos
Voice of Greece - Supplied by Louis Ec
Jeff Spitz - FM Control in 1978 - The green room with the New <br/>Teac on the left,<br/>and the NEW Cart Deck on the right.
Jeff Spitz - FM Control in 1978 - The
1978 - Dr Bloustein on the View Presidents Office.
1978 - Dr Bloustein on the View Presid
Car Press Pass - These were hard to get back then.
Car Press Pass - These were hard to ge
Un-used WRSU Press Card - Front
Un-used WRSU Press Card - Front
Un-used WRSU Press Card - Back
Un-used WRSU Press Card - Back
1978 - WRSU was the Source - One of our better attempts on a vocal logo
1978 - WRSU was the Source - One of ou
Pledge Drive - WRSU was not funded over the summer and this money paided for Summer operations
Pledge Drive - WRSU was not funded ove
Pledge Drive - WRSU was not funded over the summer and this money paided for Summer operations
Pledge Drive - WRSU was not funded ove
Pledge Drive - WRSU was not funded over the summer and this money paided for Summer operations
Pledge Drive - WRSU was not funded ove
Mike Blishak in Studio A - The room was more empty back in 78
Mike Blishak in Studio A - The room wa
Mike Blishak in Studio A - The room was more empty back in 78
Mike Blishak in Studio A - The room wa
Steve Boy and Dan Schleck in FM control
Steve Boy and Dan Schleck in FM contro
Prisoners Against Crime - Notice in the News Tribune
Prisoners Against Crime - Notice in th
1978 - The Radio Line Order for the
1978 - The Radio Line Order for the "P
Notice in the Star Ledger for the State Wide Lifers Group Call in - This pushed WRSU Technical Capabilities to the limit
Notice in the Star Ledger for the Stat
Lifers Against Crime - Notice in the News Tribune - Supplied by Mike Blishak
Lifers Against Crime - Notice in the N
Lifers Against Crime - Supplied by Mike Blishak
Lifers Against Crime - Supplied by Mik
WRSU actually made the UPI round up.
WRSU actually made the UPI round up.
Prisoners Against Crime
Prisoners Against Crime
Prisoners Against Crime
Prisoners Against Crime
Prisoners Against Crime
Prisoners Against Crime
Prisoners Against Crime
Prisoners Against Crime
Prisoners Against Crime
Prisoners Against Crime
Prisoners Against Crime
Prisoners Against Crime
Prisoners Against Crime
Prisoners Against Crime
Prisoners Against Crime
Prisoners Against Crime
Prisoners Against Crime
Prisoners Against Crime
Prisoners Against Crime
Prisoners Against Crime
Prisoners Against Crime
Prisoners Against Crime
Prisoners Against Crime - The News Tribune
Prisoners Against Crime - The News Tri
Prisoners Against Crime
Prisoners Against Crime
Prisoners Against Crime - Targum Ad
Prisoners Against Crime - Targum Ad
12 College Avenue in 1978
12 College Avenue in 1978
12 College Avenue in 1978 - Door Closer
12 College Avenue in 1978 - Door Close
Display in 3rd Floor Lounge in the Rutgers Student Center for WRSU 30th Anniversary
Display in 3rd Floor Lounge in the Rut
Display in 3rd Floor Lounge in the Rutgers Student Center for WRSU 30th Anniversary
Display in 3rd Floor Lounge in the Rut
The WRSU Clock - Still existed in 2018 - and the Ressloron Home Brew Mixer from about 1960
The WRSU Clock - Still existed in 2018
Mike Blishak in Studio A - Possibly this photo was taken during the interview for the 30 Years on the Banks program.
Mike Blishak in Studio A - Possibly th
Mike Blishak in Studio A - Possibly this photo was taken during the interview for the 30 Years on the Banks program.
Mike Blishak in Studio A - Possibly th
Mike Blishak in Studio A - Possibly this photo was taken during the interview for the 30 Years on the Banks program.
Mike Blishak in Studio A - Possibly th
Mike Blishak in Studio A - Possibly this photo was taken during the interview for the 30 Years on the Banks program.
Mike Blishak in Studio A - Possibly th
Targum Notice concerning 30 Years on the Banks Program - Front Page
Targum Notice concerning 30 Years on t
Targum Notice concerning 30 Years on the Banks Program - Continued from page 1
Targum Notice concerning 30 Years on t
Basketball Fund Raiser May 78-Rahway State Prison - Lew Shaine, Bob Lazarczyk, Steve Greene, Tony Grosewz, Dave Siegleman, Tony Malanga
Basketball Fund Raiser May 78-Rahway S
Basketball Fund Raiser May 78-Rahway State Prison -Lew Shaine, Tony Malanga, Art Still, Bill Bradley, Bob Lazarczyk, Tony Grosewz, Dave Siegleman, Steve Greene
Basketball Fund Raiser May 78-Rahway S
May 1978 George St Festival - Bob Caputo, Rick Capriolla, Janet Fabro
May 1978 George St Festival - Bob Capu
May 1978 George St Festival - Rick Capriolla, Janet Fabro - Live from Inside in the PJ Young Window!
May 1978 George St Festival - Rick Cap
1978 - The Bill for the 30th Anniversary Banquet at the Rutgers Club on College Avenue. If you have a picture of the Banquet, please pass it along.
1978 - The Bill for the 30th Anniversa
1978 - WRSU founder Charles Brookwell and Station Advisor Nathan Shoehalter
1978 - WRSU founder Charles Brookwell
1978 - 30 Years on the Banks - Anniversary Program - So Far has not be duplicated on documenting WRSU History to that point.
1978 - 30 Years on the Banks - Anniver
1978
1978
1978 - Stu Brown was a WRSU Staffer.
1978 - Stu Brown was a WRSU Staffer.
1978 - A list of Radio Lines - Yes $1.40/Month - That is why we kept them.
1978 - A list of Radio Lines - Yes $1.
1978 - Football Schedule and who covered them.
1978 - Football Schedule and who cover
1978 - Fixing the Scully.
1978 - Fixing the Scully.
Daniel Schleck - Press Pass - all glued together
Daniel Schleck - Press Pass - all glue
Daniel Schleck - Press Pass - all officially signed...
Daniel Schleck - Press Pass - all offi
Scarlet Letter 1978
Scarlet Letter 1978
1978 - Live From George Street. Left: Jay Duhl, Dan Schleck on the board, Mike Blishak doing the interview. Our Felt Banner.
1978 - Live From George Street. Left:
1978 - Jay Duhl and Daniel Schleck
1978 - Jay Duhl and Daniel Schleck
1978 - Scarlet Letter
1978 - Scarlet Letter
1978 - Scarlet Letter
1978 - Scarlet Letter
1978 - Scarlet Letter
1978 - Scarlet Letter
1978 - Alex Kuleshenko(?)
1978 - Alex Kuleshenko(?)
Don Parissi
Don Parissi
1978 - Stu Brown
1978 - Stu Brown
Dan Schleck on the Board
Dan Schleck on the Board
Ira Kaplan
Ira Kaplan
1978 - Jerry Donnelly General Manager (Future Broadcast Administrator)
1978 - Jerry Donnelly General Manager
Fred Potter Chief Engineer
Fred Potter Chief Engineer
1978 - Jay Duhl - Promotions
1978 - Jay Duhl - Promotions
1978 - Governor Brendan Thomas Byrne being interviewed for WRSU
1978 - Governor Brendan Thomas Byrne b
1978 - Governor Brendan Thomas Byrne being interviewed for WRSU
1978 - Governor Brendan Thomas Byrne b
1978 - L to R: Steve Greene, Sue Nocitra, Mike Blishak at the WRSU Christmas party.
1978 - L to R: Steve Greene, Sue Nocit

1978 30 Years on the Banks Jacket Cover - Printed by ABC Records
1978 30 Years on the Banks Jacket Cove
1978 30 Years on the Banks Jacket Cover - Printed by ABC Records
1978 30 Years on the Banks Jacket Cove
30 Years on the Banks Jacket Cover - Printed by ABC Records - Test Pressing of the Record
30 Years on the Banks Jacket Cover - P
1978-From Joan Kiessling Erle - WRSU Christmas Party
1978-From Joan Kiessling Erle - WRSU C
1978-From Joan Kiessling Erle - WRSU Christmas Party
1978-From Joan Kiessling Erle - WRSU C
1978-From Joan Kiessling Erle - WRSU Christmas Party
1978-From Joan Kiessling Erle - WRSU C
1978-From Joan Kiessling Erle - WRSU Christmas Party
1978-From Joan Kiessling Erle - WRSU C
1978-From Joan Kiessling Erle - WRSU Christmas Party
1978-From Joan Kiessling Erle - WRSU C
1978-From Joan Kiessling Erle
1978-From Joan Kiessling Erle
1978-From Joan Kiessling Erle
1978-From Joan Kiessling Erle
1978-From Joan Kiessling Erle
1978-From Joan Kiessling Erle
1978-From Joan Kiessling Erle
1978-From Joan Kiessling Erle
1978-From Joan Kiessling Erle
1978-From Joan Kiessling Erle
1978-From Joan Kiessling Erle
1978-From Joan Kiessling Erle
1978-From Joan Kiessling Erle
1978-From Joan Kiessling Erle
1978-From Joan Kiessling Erle - WRSU Softball Game
1978-From Joan Kiessling Erle - WRSU S
1978-From Joan Kiessling Erle - WRSU Softball Game
1978-From Joan Kiessling Erle - WRSU S
1978-From Joan Kiessling Erle - WRSU Softball Game
1978-From Joan Kiessling Erle - WRSU S
1978-From Joan Kiessling Erle - WRSU Softball Game
1978-From Joan Kiessling Erle - WRSU S
1978-From Joan Kiessling Erle
1978-From Joan Kiessling Erle
1978-From Joan Kiessling Erle
1978-From Joan Kiessling Erle
1978-From Joan Kiessling Erle
1978-From Joan Kiessling Erle
1978-From Joan Kiessling Erle
1978-From Joan Kiessling Erle

Image Supplied by Stuart Brown - 1978
Image Supplied by Stuart Brown - 1978
Image Supplied by Dr. Stu Brown who is still playing music all these years later.<br>SoundsofBroadway.com
Image Supplied by Dr. Stu Brown who is
1978 WRSU Orientation Slide Show<br/>WRSU 1978 FM Control - 4 years after going FM<br>Bob Nagengast <br>Slide #2
1978 WRSU Orientation Slide Show
W
1978 WRSU Orientation Slide Show<br/>Maria Dandola in Announce Booth 1<br>Slide #03
1978 WRSU Orientation Slide Show
M
1978 WRSU Orientation Slide Show<br/>Studio A <br>Slide #4
1978 WRSU Orientation Slide Show
S
1978 WRSU Orientation Slide Show<br/>Production <br> Checking out the Scully Tape Machine Tom Chabrack CE <br>Slide #05
1978 WRSU Orientation Slide Show
P
1978 WRSU Orientation Slide Show<br/>Jeff Broido, Unknown , Linda Gold <br>Slide #06
1978 WRSU Orientation Slide Show
J
1978 WRSU Orientation Slide Show<br/>FM Control - Gate Executive Console Bob Nagengast<br>Slide #07
1978 WRSU Orientation Slide Show
F
1978 WRSU Orientation Slide Show<br/>FM Control 1978 <br>Slide #14
1978 WRSU Orientation Slide Show
F
1978 WRSU Orientation Slide Show<br/>Cueing a 45. Take it out of gear....
1978 WRSU Orientation Slide Show
C
1978 WRSU Orientation Slide Show<br/>Take to Take a Reading with clanky original remote control.
1978 WRSU Orientation Slide Show
T
1978 WRSU Orientation Slide Show<br/>Pulling a Cart<br>Slide #18
1978 WRSU Orientation Slide Show
P
1978 WRSU Orientation Slide Show<br/>Bob Nagengast - What should I play next?<br>Slide #19
1978 WRSU Orientation Slide Show
B
1978 WRSU Orientation Slide Show<br/>Record Library - The Age of Vinyl<br>Slide #20
1978 WRSU Orientation Slide Show
R
1978 WRSU Orientation Slide Show<br/>News Room - Typewriters everywhere<br>Slide #21
1978 WRSU Orientation Slide Show
N
1978 WRSU Orientation Slide Show<br/>Another View of the News room - Maria Dandola<br> No Computers Back then<br>Slide #22
1978 WRSU Orientation Slide Show
A
1978 WRSU Orientation Slide Show<br/>The Clanking AP Machine - in the closet with reams of yellow paper<br>Slide #23
1978 WRSU Orientation Slide Show
T
1978 WRSU Orientation Slide Show<br/>News Pro - The Producer Console with Maria Dandola<br>Slide #24
1978 WRSU Orientation Slide Show
N
1978 WRSU Orientation Slide Show<br/>Checking the Production Board with Tom Chabrack<br>Slide #29
1978 WRSU Orientation Slide Show
C
1978 WRSU Orientation Slide Show<br/>FM Rack<br>Slide #30
1978 WRSU Orientation Slide Show
F
1978 WRSU Orientation Slide Show<br/>Tech Desk with Tom Chabrack<br>Slide #35
1978 WRSU Orientation Slide Show
T
1978 WRSU Orientation Slide Show<br/>Producing a Show in Production - Linda Gold<br>Slide #38
1978 WRSU Orientation Slide Show
P
1978 WRSU Orientation Slide Show<br/>Production<br>Note the typewriter and Bulk Tape Eraser<br>Slide #40
1978 WRSU Orientation Slide Show
P
1978 WRSU Orientation Slide Show<br/>Studio A from the FM Side<br>Slide #41
1978 WRSU Orientation Slide Show
S
1978 WRSU Orientation Slide Show<br/>News Room <br> Slide #44
1978 WRSU Orientation Slide Show
N
1978 WRSU Orientation Slide Show<br/>Studio A with the Hanging RCA 77DX microphones <br> Slide #45
1978 WRSU Orientation Slide Show
S
1978 WRSU Orientation Slide Show<br/>Sports Desk <br>Paul Spyahala<br>Slide #46
1978 WRSU Orientation Slide Show
S
1978 WRSU Orientation Slide Show<br/>FM Control<br>Slide #47
1978 WRSU Orientation Slide Show
F
1978 WRSU Orientation Slide Show<br/>Production<br>Unknown, Unknown,Rick Capriola<br>Slide #49
1978 WRSU Orientation Slide Show
P
1979: Production - Long list of things to do
1979: Production - Long list of things
1979
1979
WRSU Budget 1979 - 1
WRSU Budget 1979 - 1
WRSU Budget 1979 - 2
WRSU Budget 1979 - 2
1979
1979
1979:WRSU staff in many different media - Left Top: Steve Greene Right Top: Stu Brown Right Bottom: Rick Capriolo
1979:WRSU staff in many different medi
1979:WRSU was there every day. Watch Out for the PIE Mafia.
1979:WRSU was there every day. Watch O





1979 Scarlet Letter
1979 Scarlet Letter
1979 Scarlet Letter
1979 Scarlet Letter
1979 Scarlet Letter
1979 Scarlet Letter
1979 - Lew Shane and Robbie Honig in Studio A doing the News
1979 - Lew Shane and Robbie Honig in S
1979 - Rick Capriolo and Steve Greene in Studio B
1979 - Rick Capriolo and Steve Greene
1979 - Larry Leibowitz covers the cancer marathon for WRSU Listeners.
1979 - Larry Leibowitz covers the canc
1979 - Chief Engineer Tom Chabrak and Assistant General Manager Tony Malanga.
1979 - Chief Engineer Tom Chabrak and
1979 - DJ Dan Lyons
1979 - DJ Dan Lyons
1979 - Big Bill Thoene
1979 - Big Bill Thoene
1979 - Rutgers Fooiball Results
1979 - Rutgers Fooiball Results
1979 - Football Schedule and the covering Staff
1979 - Football Schedule and the cover
1979 - Press Pass
1979 - Press Pass
Visitor Count:638 Calling Server 216.73.216.233 Oct 31 2026 15:08:57 Remote Host:216.73.216.233
Last Updated gallery_common_decade.phpMar 16 2022 15:44:58
wrsufmco_wrsufm.com_shorttime_gallery_common_decade1970.dat Oct 31 2026 15:08:57